Comprehensive Sabine Watershed Management Plan Report
Table of Contents Appendix F - Opinion of Probable Construction Cost

Executive Summary

1.0 Introduction

2.0 Water Needs

3.0 Existing Surface Water Supplies

4.0 Existing Ground Water Supplies

5.0 Comparison of Existing Supply and Projected Demand

6.0 Additional Supply from Water Conservation

7.0 Potential Surface Water Projects

8.0 Potential Ground Water
Resources

9.0 Water and Wastewater Treatment Needs

10.0 Water Quality & Environmental Issues

11.0 Other Water Related Issues

12.0 Information Management
and Public Participation

13.0 Recommendations

Appendices

List of Figures

List of Tables

Return to Appendix F Directory Return to List of Appendices

Toledo Bend Pipeline

Opinion Of Probable Construction Cost

Toledo Bend Pipeline

Sabine River Authority

Account No.

Estimator

Checked By

Date

SRA96425

JSV/JMC

JMN

November 12, 1998

 

Item

Description

Quantity

Unit

Unit Price

Total

Option 1 - 60" Pipeline

       
 

Pipeline

1

LS

$0.00

$0.00

 

Pump Station

1

LS

$0.00

$0.00

 

Lift Stations

1

LS

$0.00

$0.00

   

Subtotal:

$0.00

   

Mobilization:

5%

$0.00

   

Subtotal:

$0.00

   

OH & P:

 

15%

$0.00

   

Subtotal:

$0.00

   

Contingency:

20%

$0.00

Project Total (Option 1)

$0.00

 

Option 2 - 72" Pipeline

 

Pipeline

1

LS

$0.00

$0.00

 

Pump Station

1

LS

$0.00

$0.00

 

Lift Stations

1

LS

$0.00

$0.00

   

Subtotal:

$0.00

   

Mobilization:

5%

$0.00

     

Subtotal:

$0.00

     

Oh & P:

15%

$0.00

     

Subtotal:

$0.00

     

Contingency:

20%

$0.00

Project Total (Option 2)

$0.00

 

Opinion Of Probable Construction Cost

Toledo Bend Pipeline - Option 1

Sabine River Authority

Account No.

Estimator

Checked By

Date

SRA96425

JSV/JMC

JMN

November 12, 1998

 

Item

Description

Quantity

Unit

Unit Price

Total

60" Pipeline

$0.00

 

Trench Safety

 

LF

$1.50

$0.00

 

60" Line

 

LF

 

$0.00

 

2000 Psi Concrete Encasement

 

LF

$80.00

$0.00

 

Coarse Aggregate Embedment

 

CY

$25.00

$0.00

 

Gate Valves

 

EA

 

$0.00

Pump Station

$0.00

 

Pumps & Motors

 

EA

 

$0.00

 

Concrete Encasement

 

CY

 

$0.00

 

Access Manhole

 

EA

 

$0.00

 

Flow Meter And Vault

1

LS

 

$0.00

     

LS

 

$0.00

Lift Stations

$0.00

 

Sump Pumps

 

EA

 

$0.00

 

Concrete Encasement

 

CY

 

$0.00

 

Access Manhole

 

EA

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

 

Opinion Of Probable Construction Cost

Toledo Bend Pipeline - Option 2

Sabine River Authority

Account No.

Estimator

Checked By

Date

SRA96425

JSV/JMC

JMN

November 12, 1998

 

Item

Description

Quantity

Unit

Unit Price

Total

72" Pipeline

$0.00

 

Trench Safety

1

LS

 

$0.00

 

60" Line

 

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

Pump Station

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

Lift Stations

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00

     

LS

 

$0.00